Technology validation and prototyping SOP and trials project plan
Type | Technical document (specification, manual) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Date | 2024-01-01 | ||||||||
Language | English | ||||||||
Ref. | WP5 Implementation and Demonstration D5.1 | ||||||||
Other localization | https://fileshare.icos-cp.eu/s/jyBJgbcjSdyYABo | ||||||||
Author(s) | Lanteri Nadine1, Carandell Widmer Matias2, Del Rio Fernandez Joaquin2, Fer Ilke3, Locaides Socratis4, Coppola Laurent5, Lemarie Edouard6, Bittig Henry6, Steinhoff Tobias7, Delory Eric8, Nati Michele9, Gates Andrew10, Hartman Suzan10, Flohr Anita10, Chauvet Adrien1, Schuster Ute11, Seelmann Katharina12 | ||||||||
Abstract | D5.1 results from the coordination of technology development and integration across participants carried out between the 1st and the 12th month of the project. D5.1 is a first release of the work plan intended for adjustment, even for strong modifications as the project progresses. D5.1 will be the road map for the WP and project leaders to coordinate the integration across the sensors, platforms and stage-gates (deployments leading to TRL7, TRL8 and sea trials in a multi RI). Task 5.2, covering the deployments to TRL6 to TRL8 will be led by UiB and EMSO (M12-36). Task 5.3 and the field trials in a multi RI context will be led by EMSO and NOC (M30-54). The deployment (modification of the work plan, preparation and operation) will be the responsibility of the tasks leader in close coordination with WP2, WP3, WP4 and WP5 leaders. After a short introduction to the project and to the context, this document presents the method and successive steps established to carry out the validation of WP2, WP3 and WP4 developments (platforms, sensors and processes). The document includes:
|
||||||||
Full Text |
|